Page 7 of 46
Re: Another Hydrostream fanatic on board.
Posted: Dec 04, 2009 11:42 pm
by Hippie459MN
The sound like a bunch of nice guys there. I did notice that they dont have 1/2" on there site.
Also, Im sure I will go through twice that on the vulture. That this is so dang long but I like it that way.

Re: Another Hydrostream fanatic on board.
Posted: Dec 04, 2009 11:42 pm
by 77viper
I'm doing good. I'm downloading pics from tonight.
Re: Another Hydrostream fanatic on board.
Posted: Dec 05, 2009 12:13 am
by 77viper
The 1/2" is there on the bottom $23 a sheet.
Hippie459MN wrote:
Also, Im sure I will go through twice that on the vulture. That this is so dang long but I like it that way.

Are we making up for something?

Re: Another Hydrostream fanatic on board.
Posted: Dec 05, 2009 12:24 am
by Hippie459MN
Re: Another Hydrostream fanatic on board.
Posted: Dec 05, 2009 8:12 pm
by ccrick
Hippie459MN wrote:Also, Im sure I will go through twice that on the vulture. That this is so dang long but I like it that way.

Not that much more than mine. The core on ours don't go all the way to the chine like vipers do. It's only a couple feet longer.

Re: Another Hydrostream fanatic on board.
Posted: Dec 05, 2009 9:12 pm
by Hippie459MN
How far up the core go in the vking? Just up to the first bulkhead just under the dash/just past the seat box?
I will have to go back and look at some pics here. lol
Re: Another Hydrostream fanatic on board.
Posted: Dec 06, 2009 11:57 am
by ccrick
It goes up under the shelf or sometimes called the air box. Dont have a good pic of it up there.
I would say a couple feet in front of the first bulkhead. As you see, no air box in mine. That took alot of weight out.
Working under the bow was the worst of it all. I even had my shop vac running with the hose up there when grinding.
Not a friendly atmosphere up there when your grinding or even when laminating.
Re: Another Hydrostream fanatic on board.
Posted: Dec 12, 2009 7:51 pm
by VultureNo2
Ok - It's all getting replaced. Got down to the core on the passenger side and found a lot of rot. Not suprised. I'm chiseling away and making some progress but its slow. There are a lot of places that it still looks good. Those come of real slow. Hippie, I have some plywood in the back along the stringers also. About 1 foot long and out about 6 inches to the side. I will get some time to post a bunch of pictures before the weekend is over. More work on it tonight. Last night 21 outside. Thank god for space heaters. Bill
Re: Another Hydrostream fanatic on board.
Posted: Dec 12, 2009 9:51 pm
by VultureNo2
Re: Another Hydrostream fanatic on board.
Posted: Dec 13, 2009 11:30 am
by VultureNo2
knocked about half of one side out last night. Sore check from leaning over the side of the boat and chiseling. I'm sure I will be back at it today as time permits. Haven't heard about a place to work on it yet. was hoping I would get an answer yesterday.
