Page 16 of 22

Re: Viper rebuild

Posted: Aug 02, 2013 8:02 am
by proprider
Me too!! Thanks for the motivation fellow streamers
YDOC462 wrote:I can't wait to see this thing fully rigged out!

[ Post made via Android ] Image

Re: Viper rebuild

Posted: Aug 06, 2013 7:20 pm
by proprider
Made a paste mixture of my 3 favorite building ingredients and spread between the hull and deck.

Re: Viper rebuild

Posted: Aug 06, 2013 7:21 pm
by proprider
Threw a full arsenal of clamps at it. Once it cures, the inside radius will get glassed together for a secure, watertight bond.

Re: Viper rebuild

Posted: Aug 06, 2013 7:52 pm
by sax
Was expecting a new top deck with a cockpit that you could lay down in !

Re: Viper rebuild

Posted: Aug 06, 2013 8:29 pm
by proprider
Ron, with a 20" v6 Merc. hangin high on the transom, not sure the low center of gravity of a laydown cockpit would be very helpful. But hey, I'll be driving from a seat instead of on my knees...lol. Hope your doing well my friend!
sax wrote:Was expecting a new top deck with a cockpit that you could lay down in !

Re: Viper rebuild

Posted: Aug 06, 2013 9:34 pm
by YDOC462
let me know if you need to borrow any clamps.....I might have a few laying around.

[ Post made via Android ] Image

Re: Viper rebuild

Posted: Aug 08, 2013 6:54 pm
by proprider
And here I thought that most of the hard stuff was done. Do not envy those that do their recore with the deck attached. Started to glass the inside radius of the hull/deck. Glassing in a smaller radius of mat first, followed by a 3" piece. Should be very stout and watertight.

Re: Viper rebuild

Posted: Aug 08, 2013 7:19 pm
by varmint1
No I don't think she's gunna come apart on you, and again great work

[ Post made via iPhone ] Image

Re: Viper rebuild

Posted: Aug 20, 2013 5:09 pm
by proprider
Now that the deck is reunited with the hull, it was time to get it off the jig. When the jig was built, it was screwed together so that it could be easily disassembled/reassembled. It is available for anyone that may be interested in it for their recore project. It is currently in the Indianapolis area and will soon be in southeastern Michigan. If it doesn't get spoken for, it will become shelving.

Re: Viper rebuild

Posted: Aug 20, 2013 5:11 pm
by proprider
More detailed pics of the jig